HomeNewsPhotos

Photos

180614-F-LQ737-0027
The Fuel Hydrant System refueling structure at Pumphouse II at Robins Air Force Base following the completion of a $16.3 million upgrade, administered by the Army Corps of Engineers-Savannah District. The upgraded system allows faster aircraft refueling times compared to using refueler trucks.

Download Image: Full Size (0.49 MB)
Photo by: Misuzu Allen |  VIRIN: 180614-F-LQ737-0027.JPG